|
Engine Work:
May 17: cut head
May 18: lapped intake valves into head - still waiting for exhaust valves
and oversized pistons to come in.
July 26: Oversized
Mahle Pistons, exhaust valves, and some other engine parts and hoses finally
arrived!!
Aug. 6: Blasted engine block.
Aug. 12: finished blasting block, primed it. Brought block and pistons to
the machine shop for surfacing and boring.
Sept. 22: Brought flywheel, crankshaft and a few other pieces to machine
shop for engine balance.
Sept. 24: Removed exhaust, gas tank, fuel pump and filter, housing.
Sept. 25: Blasted and painted gas tank straps and fuel pump housing
brackets.
Oct. : Picked up flywheel, block, crank, cam, pistons, etc. from machine
shop ... looks good!
Nov. 18: Received new Autotech 260 cam and adjustable cam gear |
|
On to the Body:
April
28: ordered Rieger grille/hood spoiler combo
May 14: removed pass side mirror, headliner, antenna, rear spoiler, blasted
and painted the two brackets that hold to the spoiler |